FETCO graphic

managed by: Richard Hoppel | Controls Engineering Manager | rhoppel@fetco.com | mobile 847.400.7505

FETCO | ProjectName: CBS-2121-A/

OneDriveExternalLinkViewonly | [LocalProjectLocation] | [README.text link][README_a_html] (This File) |

Product

Component Status FETCO PN REV Sub-Director Notes (Links to PDF or other types of Docs)
Prototype Build Completed 1101.00303.00 A CBS-2121-A 10

To Do


Significant Changes

last update: 2017.MM.DD

Date Change Notes
2017.6.20 INITIAL New Format

Directory Structure

syntax: [Linked Directory] Note: only Production Directories/Files are shared with our Production Partners

[..] Up A Directory

[Drawings] Production Sub-Assembly Drawings

FETCO PN Rev Drawing Name
1101.00303.00 A Automatic Combination Coffee Brewer

[Design] Design Data.

[Documents] it is what it says

[img] Production images used for documentation

[Archive] Obsolete Data.

[Released] Released Project Components


[img]

image ? ?
FETCO_label
FETCO_label
FETCO_label
FETCO_label